About the application

The Masterplan site covers approximately 53 acres. Given the size of the site and the nature of the development, the application is submitted in hybrid form whereby the first four buildings (Plots A1, A2, K1 and C) are submitted in detail (i.e. no matters reserved) and the remainder of the development is submitted in outline with all matters reserved for future determination through subsequent Reserved Matters applications. There will be further engagement on each Reserved Matters Application as it comes forward.

 

The outline application does not approve all elements of the development but establishes the parameters within which future buildings can come forward, including the height, scale and quantum of uses being proposed. Full details for first four plots are provided with detailed plans, sections and elevations, alongside Computer Generated Images of how the buildings will appear.

 

Revised planning application

A planning application for the Canada Water Masterplan was first submitted in May 2018. In response to feedback from the local community, Southwark Council, other public bodies such as the Greater London Authority (GLA) and Transport for London (TfL), changes to the planning application were made in October 2018, March 2019 and June 2019.

 

Delivering more homes, including affordable homes, is a key issue for local residents, and we recognise how important it is that we provide homes that support local community needs. Following our ongoing discussions with local residents, Southwark Council and the Greater London Authority, in June 2019 we submitted amendments to the planning application, relating primarily to our affordable housing offer, as well as to some other minor amendments, such as additional transport assessments that had been carried out.

 

For full details of the changes made to the planning application, please view Section 4 of our Frequently Asked Questions page.

 

The Three “Control Documents”

For the outline application, the Design and Access Statement describes what could come forward in the future, although the precise nature and form of the buildings is not yet known. To ensure that future Reserved Matters applications are acceptable, three Control Documents will form part of any planning permission.

 

Development Specification:

The Development Specification sets out the maximum amount of floorspace (for each land use proposed) that can ultimately come forward on the site.

 

Parameter Plans:

The Parameter Plans are a series of drawings that establish rules for the development, controlling the layout and scale of future development zones. The Parameter Plans set minimum and maximum zone extents and maximum building heights. They should be read in conjunction with the Development Specification. The Parameter Plans also set out the vehicle and pedestrian access points; the location of key roads and the minimum extent of public realm.

 

Design Guidelines:

The Design Guidelines should be read alongside the Parameter Plans and Development Specification. The Design Guidelines establish binding standards for future buildings and public realm which will come forward as part of the Reserved Matters process.

 

The potential form of the development based on all of the design principles and concepts that underpin the Development Specification, Parameter Plans and Design Guidelines are represented in the Illustrative Masterplan which is described in detail in the Masterplan Design and Access Statement.

 

Following submission of the planning application in May 2018, these documents were updated in October 2018, March 2019 and June 2019.

Project Timeline

Community consultation started in Spring 2014, and between then and Summer 2019 we held over 120 public consultation and local outreach events, with a total attendance of more than 11,000. We would like to thank everybody who has contributed their valuable time and ideas to the discussions so far, which has directly informed, and in some cases changed, the plans. In September 2019, Southwark Council’s Planning Committee resolved to grant planning permission, which is the first stage in the approvals process – read more here. We’re committed to maintaining local involvement in the long term and community engagement will continue through the planning application period and beyond.

 






Load More Downloads
Load More Downloads

Ongoing Engagement

 

We’re committed to maintaining local involvement in the long term and community engagement will continue through the planning application period and beyond.

As this is mainly an outline planning application, there will be further engagement on detailed designs for subsequent plots as they come forward. We will continue to meet Southwark Council, Transport for London, the Greater London Authority, local stakeholders, neighbours of the site and residents – as we have done in respect of this application. In addition we will continue to discuss key themes and attend various community events and meetings.

Please get in touch with the team if you have any questions or would like more information.

 

Local Communications Commitment

Since the submission of a planning application, we have experienced a significant increase in correspondence and requests for information. This increase is very much welcomed, and we’re grateful for people wishing to get involved with the project.  To ensure that we are able to effectively deal with the volume of requests and also to ensure they are properly recorded, we have developed a ‘Local Communications Commitment’ that can be viewed here.